Archives: Projects

Project Details

Project Name
Mountain Valley Middle School
Client
Canyon Independent School District
Category
Educational Institutions
Location
Canyon Lake, TX
Year
2018

Project Summery

We were brought in to replace ductwork in designated classrooms.

Project Details

Project Name
Cast Med High School
Category
Educational Institutions

Project Summery

This project consisted of several existing buildings. We replaced above-ceiling cooling units, ductwork throughout the classrooms and offices, and air devices.

Project Details

Project Name
Victoria Secret Riverside Mall
Client
Victoria Secret Riverside Mall
Category
Retail
Location
San Antonio, TX
Year
2018

Project Summery

This was an existing retail space in the Riverside Mall in San Antonio, Texas. Most of the existing duct and air devices were removed and new ducts, air devices, and thermostats were installed.

Project Details

Project Name
Emler Swim School
Client
Emler Swim School
Category
Retail
Location
San Antonio, TX
Year
2019

Project Summery

This was an existing building that needed to have air ducts replaced because of the corrosive nature of the chlorine in the air. Air ducts were replaced and the rooftop unit was serviced.

Project Details

Project Name
Shake Shack
Client
Shake Shack
Category
Eateries
Location
Houston, TX
Year
2020

Project Summery

This was a renovation project of an existing building. We provided and installed all round duct, rectangular duct, flex duct, spiral duct, collars, hangers, straps, canvas connectors, taps, and air devices. Installed a new inline exhaust fan into the existing duct. We tied in all the new ductwork to existing rooftop unit. Inspected the existing drain lines, controls and outside air and rooftop unit.

Project Details

Project Name
Dawson Server Room
Client
Dawson Geophysical Co
Category
Special Projects
Location
Houston, TX
Year
2022

Project Summery

This was a two-part project. The first required new duct and air devices installed in the server room from the building-provided air. The second part was installing a new split system for extra cooling.

Project Details

Project Name
Comprehensive Labs
Client
Comprehensive Lab
Category
Special Projects
Location
Houston, TX
Year
2021

Project Summery

We have more than twenty years of experience. During that time, we’ve become expert in freight transportation by air and all its related services. We work closely with all major airlines around the world. Corporate Offices For construction project once the design has been completed by the Professional. when the freight is available, what the required delivery date is, and if there’s potential to save on time or cost.

Project Details

Project Name
Missouri City Wastewater Treatment Plant
Client
PLW Waterworks
Category
Wastewater Treatment
Location
Missouri City, TX
Year
2021

Project Summery

We have more than twenty years of experience. During that time, we’ve become expert in freight transportation by air and all its related services. We work closely with all major airlines around the world. Corporate Offices For construction project once the design has been completed by the Professional. when the freight is available, what the required delivery date is, and if there’s potential to save on time or cost.

Project Details

Project Name
Brake Check – Sam Houston
Client
Grawood Construction
Category
Retail
Location
Houston, TX
Year
2021

Project Summery

We have more than twenty years of experience. During that time, we’ve become expert in freight transportation by air and all its related services. We work closely with all major airlines around the world. Corporate Offices For construction project once the design has been completed by the Professional. when the freight is available, what the required delivery date is, and if there’s potential to save on time or cost.

Project Details

Project Name
Carve American Grill
Client
Ameritech Facility Services
Category
Eateries
Location
Austin, TX
Year
2021

Project Summery

This was a renovation project of an existing building. We provided and installed all round duct, rectangular duct, flex duct, spiral duct, collars, hangers, straps, canvas connectors, taps, and air devices. Installed a new inline exhaust fan into the existing duct. We tied in all the new ductwork to existing rooftop unit. Inspected the existing drain lines, controls and outside air and rooftop unit.